Blain’s Palm Tree Farm – Project 2 – Post 5 of 5 – Power and Final Irrigation

The final stage was having the well drilled and water flowing to the property.  The first thing was getting a permit for the electrical work, after the inspection the well was hooked up. The well went 190 feet down into the lie rock and I had a rock well dug instead to ensure that the well does not cave in due to erosion over time. The well and pump (approximately 20 gallons a minute) were put in with an inline feeder (blue barrel) so trees can get liquid food on a schedule. Water stakes made by Senninger are being used for 4 gallons a hour.

DSCN0303